Return to search

Developing a procedure to optimise cycle time in a manufacturing plant / Venter J.P

Productivity advances generated from ‘lean manufacturing’ are self–evident. Plants
that adopt ‘lean’ are more capable of achieving shorter lead times, less waste in the
system and higher quality levels.
The goal of this study was to ascertain which ‘lean’ tools and techniques are
available for use. A matrix was constructed with a summation of the authors who
agree that specific ‘lean’ tools will reduce cycle time.
It was found that reduced set–up time and waste elimination are most affected by the
implementation of ‘lean’ tools and techniques.
An empirical study was conducted to confirm the results of the literature study. The
respondents’ knowledge on the ‘lean’ tools was also tested. It was found that
respondents have a sound understanding of set–up time; they agree that it must be
reduced in the plant. Pre–scientific evidence and the response from the empirical
study confirm that there is a substantial amount of waste in the factory.
A current state value–stream map was drawn from a single welded part Product X.
The value–stream was analysed to reduce the cycle time in the process, with the
focus on set–up time reduction and waste elimination. The future state value–stream
map was drawn, displaying astonishing results.
A continuous improvement (kaizen) programme will help reduce the cycle time even
further by making use of the other ‘lean’ tools discussed in this study. This
programme forms part of the procedure to optimise cycle time. / Thesis (M.B.A.)--North-West University, Potchefstroom Campus, 2012.

Identiferoai:union.ndltd.org:NWUBOLOKA1/oai:dspace.nwu.ac.za:10394/7271
Date January 2011
CreatorsVenter, Johannes Petrus
PublisherNorth-West University
Source SetsNorth-West University
Detected LanguageEnglish
TypeThesis

Page generated in 0.0018 seconds