Return to search

Ondersoek na faktore wat onbeplande onderhoud op bates van die Nasionale Departement van Openbare Werke beïnvloed (Afrikaans)

The objective of this research project is to determine, by means of an exploratory study, which factors in Regional Offices of the National Department of Public Works, influence the success of unplanned maintenance on property. The report has been divided into five chapters. Chapter one consists mainly of the introduction, statement of the problem, hypothesis and delimitations and background of this report. Chapter two contains the literature review. Chapter three contains the research methodology and a practical investigation. Chapter four presents the collection and analysis of data. In the last chapter of this report, chapter five, the summary, conclusions and recommendations are presented. / Thesis (MSc (Project Management))--University of Pretoria, 2004. / Construction Economics / unrestricted

Identiferoai:union.ndltd.org:netd.ac.za/oai:union.ndltd.org:up/oai:repository.up.ac.za:2263/24081
Date23 April 2003
CreatorsMarais, Johannes Petrus
ContributorsG. Basson, Hannes.Marais@dpw.gov.za
Source SetsSouth African National ETD Portal
Detected LanguageEnglish
TypeThesis
Rights© 2002, University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria.

Page generated in 0.0021 seconds