Return to search

Dílčí vyhodnocení zkušebního provozu úpravny vody Mostiště

This thesis pursues an evaluation of sectional trial operation of wastewater treatment plants in Mostiště, where the reconstruction has been started on 1st March 2012. A core of the works consisted of a complete reconstruction and intensification for providing a production of drinking water which suit tigtening law requirements on drinking water quality throughout the whole year and would be appreciated by users of drinking water. The necessity of the reconstruction and completion of a water treatment technological line came out of insufficiency -- worsening of raw water quality, bad technical condition of the whole line and some moral obsolescence of the line and especially of problematic quality of produced water according to specific indexes. An outcome of this thesis is an evaluation of efficiency and functionality of a modernized water treatment plant which is in trial operation for now, with help of chosen indexes controled after each separation step which are statisticaly processed into graphs and verbally rated.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:250243
Date January 2015
CreatorsKadlecová, Veronika
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0018 seconds