Return to search

Požární stanice / Fire station

Diploma thesis solves the creation of layout study and creation of documentation for the realization new fire station. It is an object amenities used to perform the fire protection services unit of the population of the professional fire category JPO I. The type of fire station is P2. The building layout consists of three interconnected buildings arranged in a U. Structurally the building is divided into two systems. The middle part of the building consists of reinforced concrete skeleton, which has two floors. On the ground floor is garage, on the second floor are located facilities for firefighters. The side buildings connected to the skeleton are build of ceramic bricks, it is a wall system. The main entrance to the building is in the south building at the level of the first floor, where is situated the administrative and operational part of building. This building has two floors. From the northern side, the technical background of the fire station and the workshop are connected to the middle part of the buildin The building is basementless and is roofed by flat roofs only. The object is located on the edge of the Kaplice town, the terrain is slightly sloping. The solved area contains a few related objects.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:265460
Date January 2017
CreatorsSchwarzová, Veronika
ContributorsMizerová,, Lenka, Smolka, Radim
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0023 seconds