This master’s thesis deals with heating and HVAC in production plant ELMET, spol. s r.o. The first part of the thesis concerns reconstruction of the central heating system, which is outdated and unreliable in the time of the writing of the thesis. The second part deals with cooling of mounting of electronics, where technological requirements are not met due to summer overheating. The third part of the thesis concerns ventilation of metalworking hall using waste heat from production machines.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:230487 |
Date | January 2013 |
Creators | Černík, Václav |
Contributors | Hejčík, Jiří, Charvát, Pavel |
Publisher | Vysoké učení technické v Brně. Fakulta strojního inženýrství |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0022 seconds