In the theoretical part, I mentioned the project management of buildings and the construction of prices in construction. In the next section I have described the building site and its water supply requirements. Finally, I have dealt with the cost of water and its consumption. The aim of the thesis was to analyze the influence of water prices on the cost of construction. I transferred this analysis to the model building in the practical part of the thesis. I determined the water consumption during construction, and then I analyzed the impact of the change in water prices on the construction cost.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:392014 |
Date | January 2019 |
Creators | Kramárová, Annamária |
Contributors | Fazekas, Monika, Nový, Martin |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Slovak |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0011 seconds