Return to search

Assessing the effects of pre-construction delay in hydropower projects

No description available.
Identiferoai:union.ndltd.org:bl.uk/oai:ethos.bl.uk:648621
Date January 2014
CreatorsPlummer, Judith Kate
PublisherUniversity of Cambridge
Source SetsEthos UK
Detected LanguageEnglish
TypeElectronic Thesis or Dissertation
Sourcehttps://www.repository.cam.ac.uk/handle/1810/283946

Page generated in 0.0019 seconds