The effect of extension in system technology on contractor costs and production schedules during the procurement of air-launched tactical munitions

Thesis (M.S. in Management)--Naval Postgraduate School, December 1990. / Thesis Advisor: Moses, Douglas O. Second Reader: Liao, Shu S.. "December 1990." Description based on title screen as viewed on April 1, 2010. DTIC Identifier(s): Logistics management, weapon systems, acquisition, technology measurements, contractors, scheduling, literature surveys, theses, statistical analysis, production schedules. Author(s) subject terms: Technology measurement, technology and cost, cost growth, schedule growth, contractor costs. Includes bibliographical references (p. 75-77). Also available in print.

Identiferoai:union.ndltd.org:OCLC/oai:xtcat.oclc.org:OCLCNo/593541674
Date January 1990
CreatorsRitchie, Robert J.
PublisherMonterey, California : Naval Postgraduate School,
Source SetsOCLC
LanguageEnglish
Detected LanguageEnglish