Germany is one of the pioneer countries in wind turbine technology. They installed many wind turbines during the last decades and are now confronted with a shortage of land suitable for new wind parks. Now, with an estimated wind turbine service life of 20 – 25 years whole wind parks are becoming obsolete and owners have to decide whether do decommission, repower or to continue the operation of their parks. The advantages of repowering as well as the bureaucratic hurdles are outlined and evaluated. This thesis deals with the repowering potential in North Rhine-Westphalia and is analysing the technical and economical possibilities of repowering. The main objectives are to identify wind turbines eligible for repowering and also to develop repowering scenarios in order to determine their techno-economic feasibility. The designed steps of the methodology allow the census and the subsequent implementation of the results in WindPro and RETScreen.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:uu-398228 |
Date | January 2019 |
Creators | Baak, Werner |
Publisher | Uppsala universitet, Institutionen för geovetenskaper |
Source Sets | DiVA Archive at Upsalla University |
Language | English |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0026 seconds