Bulk electric system reliability analysis is an important activity in both vertically integrated and unbundled electric power utilities. Competition and uncertainty in the new deregulated electric utility industry are serious concerns. New planning criteria with broader engineering consideration of transmission access and consistent risk assessment must be explicitly addressed. Modern developments in high speed computation facilities now permit the realistic utilization of sequential Monte Carlo simulation technique in practical bulk electric system reliability assessment resulting in a more complete understanding of bulk electric system risks and associated uncertainties. Two significant advantages when utilizing sequential simulation are the ability to obtain accurate frequency and duration indices, and the opportunity to synthesize reliability index probability distributions which describe the annual index variability. <p>This research work introduces the concept of applying reliability index probability distributions to assess bulk electric system risk. Bulk electric system reliability performance index probability distributions are used as integral elements in a performance based regulation (PBR) mechanism. An appreciation of the annual variability of the reliability performance indices can assist power engineers and risk managers to manage and control future potential risks under a PBR reward/penalty structure. There is growing interest in combining deterministic considerations with probabilistic assessment in order to evaluate the system well-being of bulk electric systems and to evaluate the likelihood, not only of entering a complete failure state, but also the likelihood of being very close to trouble. The system well-being concept presented in this thesis is a probabilistic framework that incorporates the accepted deterministic N-1 security criterion, and provides valuable information on what the degree of the system vulnerability might be under a particular system condition using a quantitative interpretation of the degree of system security and insecurity. An overall reliability analysis framework considering both adequacy and security perspectives is proposed using system well-being analysis and traditional adequacy assessment. The system planning process using combined adequacy and security considerations offers an additional reliability-based dimension. Sequential Monte Carlo simulation is also ideally suited to the analysis of intermittent generating resources such as wind energy conversion systems (WECS) as its framework can incorporate the chronological characteristics of wind. The reliability impacts of wind power in a bulk electric system are examined in this thesis. Transmission reinforcement planning associated with large-scale WECS and the utilization of reliability cost/worth analysis in the examination of reinforcement alternatives are also illustrated.
Identifer | oai:union.ndltd.org:USASK/oai:usask.ca:etd-12152005-133551 |
Date | 19 December 2005 |
Creators | Wangdee, Wijarn |
Contributors | Xu, Wilsun, Wacker, Gary, Oguocha, Ikechukwuka N., Klymyshyn, David M., Karki, Rajesh, Billinton, Roy |
Publisher | University of Saskatchewan |
Source Sets | University of Saskatchewan Library |
Language | English |
Detected Language | English |
Type | text |
Format | application/pdf |
Source | http://library.usask.ca/theses/available/etd-12152005-133551/ |
Rights | unrestricted, I hereby certify that, if appropriate, I have obtained and attached hereto a written permission statement from the owner(s) of each third party copyrighted matter to be included in my thesis, dissertation, or project report, allowing distribution as specified below. I certify that the version I submitted is the same as that approved by my advisory committee. I hereby grant to University of Saskatchewan or its agents the non-exclusive license to archive and make accessible, under the conditions specified below, my thesis, dissertation, or project report in whole or in part in all forms of media, now or hereafter known. I retain all other ownership rights to the copyright of the thesis, dissertation or project report. I also retain the right to use in future works (such as articles or books) all or part of this thesis, dissertation, or project report. |
Page generated in 0.002 seconds