This thesis deals with the design of a lean manufacturing process with the main focus on the modification of the production layout of the heat pump production line, at Daikin Device Czech Republic s.r.o. In the introductory part of the thesis, the theoretical background is elaborated and then the company is introduced briefly. The next part analyzes the currently produced models, production processes, the line in terms of current layout and finally the process times. Based on these analyzes, a new layout of the production line and storage space is presented. In the next part of the thesis, the conditions of implementation are defined. The final part evaluates the benefits of this work based on the real results that the new layout resulted in.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:400915 |
Date | January 2019 |
Creators | Novák, David |
Contributors | Zíma, Jakub, Jurová, Marie |
Publisher | Vysoké učení technické v Brně. Fakulta strojního inženýrství |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0018 seconds