Return to search

Design study of a three span continuous tied-arch bridge

Thesis (M.S.)--University of Missouri, School of Mines and Metallurgy, 1939. / The entire thesis text is included in file. Typescript. Title from title screen of thesis/dissertation PDF file (viewed April 7, 2010) Includes bibliographical references (p. 57-58).

Identiferoai:union.ndltd.org:OCLC/oai:xtcat.oclc.org:OCLCNo/603767898
Date January 1939
CreatorsSteen, George Perry,
PublisherRolla, Mo. : School of Mines and Metallurgy of the University of Missouri,
Source SetsOCLC
LanguageEnglish
Detected LanguageEnglish
TypeElectronic books. Electronic dissertations.
SourceFreely available online

Page generated in 0.002 seconds