The diploma thesis deals with the solution of the multi-purpose building project in Lužice. This work includes the extended accompanying and summary technical report, the coordination situation of the construction, the technical report of the transport relations and the coordination of the oversized transport, the object time schedule and the financial plan of the construction, the plan for providing the material resources containing the staff balance for the construction of the main building, the time schedule for the assembly of the prefabricated skeleton, technological standard for prefabricated skeleton, design of main building machines and mechanisms including their time commitment, organization of construction of multipurpose building including drawings of construction site equipment, technological regulation for assembling of prefabricated skeleton and for making of reinforced concrete floor, inspection and testing plan for prefabricated skeleton assembly, lifting mechanism, assembly schemes for prefabricated skeleton elements, lifting mechanism verification schemes, item budget prefabricated skeleton chalk and instructions for building use and maintenance.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:371979 |
Date | January 2018 |
Creators | Mouka, Jiří |
Contributors | Liška, Pavel, Nečasová, Barbora |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.1089 seconds