This thesis discusses the reconstruction of the turbogenerator TG5 of the Elektrárny Opatovice and introduces options of technical solutions for power central of combined heat and electricity production. First section describes the differences between back-pressure and condensing turbines. Next section briefly introduces the company Elektrárny Opatovice a.s. with the description of the current back-pressure turbine TG5, which is near end of it life cycle and is to be reconstructed in following years. Based on the technical-economic analysis of the operation of the current TG5, possible benefits of new technical solutions are proposed.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:378635 |
Date | January 2018 |
Creators | Rak, Vítek |
Contributors | Milčák, Pavel, Kracík, Petr |
Publisher | Vysoké učení technické v Brně. Fakulta strojního inženýrství |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0015 seconds