This work deals with the measurement time frames and then balancing of assembly line in the company IFE-CR in segment drive units rail vehicles. The first part of thesis is focused on methods of work measurement, method improving quality eight disciplines problem solving and one of the many basic methods lean production 5S. The second part of thesis is introducing company, company's history, products and distribution drive units for rail vehicles. The following part is focused a distribution of production hall, description of workplaces and detailed description of assembly line. The practical part is focused on time frames of assembly operations and theirs compare before and after balancing of assembly line. The last part of the thesis deals evaluation of results balancing of assembly line with focus on productivity.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:231406 |
Date | January 2014 |
Creators | Kolečkář, Jan |
Contributors | Zemčík, Oskar, Kubík, Roman |
Publisher | Vysoké učení technické v Brně. Fakulta strojního inženýrství |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0018 seconds