Return to search

Mostní konstrukce přes rozšířené koryto řeky / Bridge over the river after its widening

This final thesis deals with new design of post-tensioned concrete bridge across river Vsetínská Bečva in the area Ústí u Vsetína. The existing bridge with three spans found in therms of inundation, that´s why is replaced by new four spans bridge construction. The bridge is situated on highway I/57 and used to transfer across the river. The superstructure is designed in three alternatives. Detailed assessment is only for one chosen variant a post-tensioned two-beam concrete.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:240098
Date January 2016
CreatorsStrouhalová, Petra
ContributorsRušar, Jaromír, Klusáček, Ladislav
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0018 seconds