This final thesis deals with new design of post-tensioned concrete bridge across river Vsetínská Bečva in the area Ústí u Vsetína. The existing bridge with three spans found in therms of inundation, that´s why is replaced by new four spans bridge construction. The bridge is situated on highway I/57 and used to transfer across the river. The superstructure is designed in three alternatives. Detailed assessment is only for one chosen variant a post-tensioned two-beam concrete.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:240098 |
Date | January 2016 |
Creators | Strouhalová, Petra |
Contributors | Rušar, Jaromír, Klusáček, Ladislav |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0018 seconds