Return to search

Posouzení připojitelnosti nového zdroje do sítě 110 kV / Assessment of connectivity of the new source to the 110 kV network

This thesis focuses on the connectivity problems of the new sources to the electrical network. The first part of the thesis deals with the description of the new source and the method of its connection to the electrical network. Furthermore, in work, there are elaborated the blocking conditions for substation TR Neratovice expanded distribution point. A distribution network operator must receive an attachment application for connecting before the actual connection. The attachments consist of study cases of conjunction that values the inverse influence on the distributional network and informs the operator about the required measures for the reliable service with the new source. PSS Sincal computer software was used to survey the inverse influences on the distributional network. Based on processed data, the evaluation of conjunction of the synchronous generator to the grid at TR Neratovice substation was reconsidered.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:400572
Date January 2019
CreatorsKopečný, David
ContributorsFojtík, Martin, Orságová, Jaroslava
PublisherVysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0219 seconds