M. Tech. Civil Engineering. / Discusses the main objective of this research was to investigate and develop an integrated catchment modelling of sedimentation processes and management for the Welbedacht reservoir. The specific objectives of the study were: 1. to determine the various sources and rates of sediment transport.; 2. to develop a model for integrated catchment sedimentation processes and 3. to apply the model developed in (2) in order to design integrated catchment sedimentation management strategies for the Welbedacht reservoir.
Identifer | oai:union.ndltd.org:netd.ac.za/oai:union.ndltd.org:tut/oai:encore.tut.ac.za:d1001100 |
Date | January 2014 |
Creators | Chabalala, Dunisani Thomas. |
Source Sets | South African National ETD Portal |
Language | English |
Detected Language | English |
Type | Text |
Format |
Page generated in 0.1218 seconds