The work is focused on assessing the structure of urban winter stadium, which will be located in Brno - Komarov. Winter stadium is designed according to standarts of ice hockey with a capacity of approximately 7 000 spectators. Of the 5 850 seating, 1 050 stalls and 100 in the VIP areas. Construction of hockey stadium is made of steel and steel-concrete columns, which together with composit transverse beam, reinforced concrete slab and bracings provide rigidity. Columns are supported by a set of bored piles with capitals. Roofing of the main part of the winter stadium is designed using a flat space frame having a maximum height of 4,5 m. Roof for entrance halls are design by a system of truss girder and purlins, which are hardened bracings to increase spatial rigidity. The structures are made of steel S 355 and concrete C 25/30. For designing steel structures was used software Scia ENGINEER and IDEA RS. Steel columns and composit beams are calculated by hand calculation. The total length of the hockey stadium is 111,5 meters, width outside the entrance hall is 82,02 m and the total width at the entrance hall is 96,85 m. The height of the building at the highest point is 25,6 meters.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:265623 |
Date | January 2017 |
Creators | Lobreis, Jan |
Contributors | Pilgr, Milan, Štrba, Michal |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0018 seconds