This work deals with the planning of industrial hall with administrative placement execution in the complex Moravostav, Modřice. The hall is founded on bored piles. This building is made of reinforced concrete structure with prefabricated deals. The facade is consisted of sheeting panels, roof deck is made from steel trapezoidal sheets. The thesis describes the procedures and other necessary connection with construction to accelerate the actual implementation of the construction site. The aim of this work is to develop selected parts of building technology project within the scope of the annex to the master‘s thesis.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:265688 |
Date | January 2017 |
Creators | Kondratenko, Bohdan |
Contributors | Klempa, Lukáš, Motyčka, Vít |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0016 seconds