Return to search

Rekonstrukce mostu přes údolí u Dobrušky / Reconstruction of the bridge acros the valley near Dobruška

The final thesis is focused on design a bridge construction. across the valley near Dobruška. The existing bridge is convenient and it will be replaced by a new bridge construction. The bridge is situated on motorway I/14 and it is used to transfer across the valley and Brtevsky brook.The bridge construction is designed in three alternatives. The chosen variant is a post-tensioned two-beam concrete construction with a lenght of 88,5 metres and a width of 14,0 metres. The calculation of load is solved in Scia Engineer 2014. The construction is designed in accordance with valid standards and it is made a drawing documentation.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:227736
Date January 2015
CreatorsDočkal, Miloš
ContributorsKrejčík, Vladimír, Klusáček, Ladislav
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0023 seconds