Return to search

Stavebně technologický projekt demolice a stavby mostu / CONSTRUCTION-TECHNOLOGY PROJECT OF BRIDGE DEMOLITION AND BRIDGE CONSTRUCTION

This diploma thesis deals with the demolition of a bridge located at the D1 motorway from Prague to Brno. The bridge no longer meets the load and width requirements of today´s standards. The thesis also deals with the construction of a new bridge, which will be expanded into D28/120 category. This expansion will allow for provisory use of the carriageways of one half of the motorway in both directions. The whole reconstruction is very time consuming that is the reason the new bridge is made of prefabricated pre-tensioned girders with a composite bridge deck. This can save time and the new bridge can be open for service in a shorter period of time.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:372040
Date January 2018
CreatorsHofírek, Radovan
ContributorsVenkrbec, Václav, Henková, Svatava
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0735 seconds