Return to search

Dálniční most přes Trať SŽDC / Highway bridge across a railway

The topic of this thesis is design and evaluation of the bridge structure. Three variants of bridging were created, among which the variant with prestressed girder deck and seven spans was chosen to detail processing. The bridge construction is built on sliding steel girder in several stages. Construction is evaluated considering the ultimate serviceability state and ultimate limit state. Emphasis is also on evaluation of construction stages. The calculation of load effects and analysis of building in stages was done in Scia Engineer 19.1 software. Design and evaluation were done according to currently valid European standards.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:433146
CreatorsMičánek, Ondřej
ContributorsRušar, Jaromír, Nečas, Radim
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0039 seconds