The purpose of the master’s thesis is about a concept of a pedestrian bridge´s bearing construction for pedestrian endorsed wires above a highway R35. The work includes a statical construction calculation of the suspended foot bridge of six spans, which has been chosen from three options. The chosen option is built of a monolithic, pre-stressed concrete board supported by suspenders, which is made by segmental elements above the fast highway. Calculation of a longitudinal direction has been made in an ANSYS application. Assembling status and cross direction of the construction has been modelled at SCIA Engineer. The construction´s recognition has been made manually expect of several towers cross-section, where the judgement has been made at IDEA StatiCa.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:227217 |
Date | January 2015 |
Creators | Hlava, Martin |
Contributors | Juchelková,, Pavlína, Nečas, Radim |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.002 seconds