The thesis focuses on the solution of the bridge construction made of prestressed concrete. The bridge is situated on the road II/485 and it is headed over the road I/48. Cathegory of the road communication is S 7,5. The construction is continuous and consists of five arrays. The lenght of the bridge construction is 125,1 m. The burden to the construction is according to ČSN EN 1991-2 standard. Inner forces are solved by using computational model. This model works on the FEM calculation axiom. The size is according to ČSN EN 1992-1-1 and ČSN EN 1992-2 standards.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:226427 |
Date | January 2013 |
Creators | Smolka, Libor |
Contributors | Neudert, Zdeněk, Panáček, Josef |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.002 seconds