M.Ing. / The purpose of this investigation was to develop a double concrete pole which could be used as an angle- or terminal structure for overhead power lines. To act as a double pole, shear flow must be transferred effectively between the two single poles to create the new stronger section. The method to transfer the shear flow must also be practical and economical...
Identifer | oai:union.ndltd.org:netd.ac.za/oai:union.ndltd.org:uj/uj:14114 |
Date | 15 September 2015 |
Source Sets | South African National ETD Portal |
Detected Language | English |
Type | Thesis |
Rights | University of Johannesburg |
Page generated in 0.0372 seconds