This master's thesis deals with the construction technology project solution of the Trade centre building. This thesis consists of a comprehensive elaborate project of implementation including the schedule and calculation, two technological regulations of operations, main mechanisms and risks connected with the realization itself. Logistics of resources, construction side and procedures needed for realization are processed as well.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:226479 |
Date | January 2013 |
Creators | Novák, Jiří |
Contributors | Ing.Václav Čech, Henková, Svatava |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0012 seconds