Return to search

Pohon regulačního kruhu PVE Merkersbach / Drive of control ring PVE Merkersbach

This thesis is focused on determination of forces acting to regulation ring of water power plant Markersbach (Germany). Solution of the problem is realized for two variants of servomotors – with and without servomotors acting surfaces balancing. Next topics of this thesis are strenght calculation of piston rod and bottom of the servomotors. Minimalization of the size of servomotors plungers by change of regulation kinematics has been done and minimal pressure in the pressure tank is determined. At the conclusion of this thesis received results are mentioned and its interpretation has been done. This thesis is provided for company Litostroj Power, ČKD Blansko Engineering, a.s.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:228065
Date January 2008
CreatorsSkoupý, Jiří
ContributorsVeselý, Jindřich, Kašpárek, Jaroslav
PublisherVysoké učení technické v Brně. Fakulta strojního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0054 seconds