Return to search

Administrativní centrum Hodonín - stavebně technologický projekt / Administrative center Hodonin - building and technological project

The content of the thesis is the implementation of the three-story brick office building with an operation in Hodonin. Text section contains the technical report on the structural and technological project technical report transport relations, study implementation of major technological stages of building SO 01, project construction site, the design of the main building machines and mechanisms, technological regulation, inspection and test plan and a plan of safety and health at work for making the 1st floor ceiling structure. The appendix section includes drawings and installations situation Minor main building structure, calculation of stripping reinforced concrete structures, timing and technology standard of the main building structure and time and financial plan construction-object.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:240463
Date January 2016
CreatorsGaďurek, Robin
ContributorsNečasová, Barbora, Vlčková, Jitka Laura
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0018 seconds