ABSTRACT
In this thesis, relationship between two most important transient stability indices, critical clearing time and generator rotor angle is examined for one machine-infinite bus system and then extended to the multimachine case and is observed to be linear.
By using the linear relationship between critical clearing time and generator rotor angle and utilizing the daily load curve, a new preventive method is proposed. The aim of this method is to make all critical clearing times longer than the relay and circuit breaker combination operation time. In the proposed method, desired critical clearing times are obtained by using on line system data and daily load curves. Then desired values are adjusted by generators output rescheduling and terminals voltage control
Visual computer language is used for graphical and numerical solutions. Comprehension of one machine infinite bus system and multimachine system transient stability become easier.
Identifer | oai:union.ndltd.org:METU/oai:etd.lib.metu.edu.tr:http://etd.lib.metu.edu.tr/upload/2/12606457/index.pdf |
Date | 01 September 2005 |
Creators | Oztop, Celal |
Contributors | Ertas, Arif |
Publisher | METU |
Source Sets | Middle East Technical Univ. |
Language | English |
Detected Language | English |
Type | M.S. Thesis |
Format | text/pdf |
Rights | To liberate the content for METU campus |
Page generated in 0.0019 seconds