Return to search

Most nad místní komunikací a potokem / Bridge over a local road and a brook

The purpose of the master thesis is the design of the concrete highway bridge by European standards. The highway is situated on two independent prestressed load-bearing structures with cross-section area of constant dimensions over its length. The bridge deck is built on a falsework considering its proportions and obstacles under the bridge. The thesis contains the design and the assessment of the load-bearing structure in longitudinal and transverse direction including the calculation of cross beams and an anchorage zone.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:227316
Date January 2015
CreatorsTichavská, Andrea
ContributorsČihák, Petr, Nečas, Radim
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0017 seconds