Return to search

Implementace nových vzduchových jističů ABB SACE Emax 2 do produktové řady nízkonapěťových rozváděčů MNS / Implementation of the new ABB SACE Emax 2 air circuit breaker series in a low-voltage MNS switchgear product portfolio

The Master’s Thesis comprises a summary of the differences existing design of MNS switchgear series against AGOMIN project innovative proposal. The introduction deals with the introduction to the CAD program SolidWorks and its extension for enterprise data management SolidWorks Enterprise PDM. The body of the paper deals with a new range of air circuit breakers ABB SACE Emax 2 and their implementation into the product line of low voltage switchgears. Included are other improvements that together with implementation of circuit breakers AGOMIN project brings.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:220989
Date January 2014
CreatorsStudený, Michal
ContributorsABB, Vladimír Horych,, Polsterová, Helena
PublisherVysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0019 seconds