Construction Technology project deals with the new building of the Labour Office in Brno. It is the administrative building of six floors above ground and one basement floor. The building has the shape of a trapezoid. Vertical and horizontal structures are designed of reinforced concrete substructure is designed of waterproof concrete system called white tub. The project includes a technical report on the construction technology of the project, coordinating the construction situation, time and financial plan for the objects, the study of the main technological stages, the project site equipment, design of the main building machines, the schedule of the main building structure, schedule, resourcing, technical regulations for selected activities inspection and test plans for selected activities and comparing two roof building.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:226982 |
Date | January 2014 |
Creators | Surý, Viktor |
Contributors | Ing. Jaroslav Hrůza,Ph.D., Kovářová, Barbora |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0019 seconds