The aim of the work was to assess and evaluate the historical development of road networks from the view of their projection in a comprehensive land adjustment. For this purpose, three cadastral areas, that represent a wide range of natural conditions, were chosen. Historical stages, in which the road network has been captured, were determined and studied in detail. To create an overview of the unpaved roads, evaluation criteria, by which individual areas were selected and compared in the chosen historical stages, were designed. On the basis of the results, the turning points of unpaved roads development were determined and their causes were described. The accomplished analysis of the road network in particular historical periods gives a clear overview in development of unpaved roads and arrangement of individual land lines. Historical image of unpaved road network, as an integrated complex, can be used only as inspirational material within the plan projection. This material has to be revised according to current legislation requirements, standards and wishes of landowners.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:113863 |
Date | January 2012 |
Creators | MÁCHA, Jiří |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0097 seconds