The Diploma thesis deals with the road bridge on tfe road 4951 across the D55 highway. Construction is proposed in three variants. The selected design was prestressed board length 67,65 meters, intended as a continuous beam. Calculation is performed by software SCIA. The construction is evaluated according to current standards.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:265480 |
Date | January 2017 |
Creators | Novotný, Matěj |
Contributors | Rušar, Jaromír, Klusáček, Ladislav |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.002 seconds