Downtime reduction analysis of the Australia Post flat mail optical character reader

Machine downtime, whether planned or unplanned, is intuitively costly to manufacturing organisations, but is often very difficult to quantify. The available literature showed that costing processes are rarely undertaken within manufacturing organisations. Where cost analyses have been undertaken, they generally have only valued a small proportion of the affected costs, leading to an overly conservative estimate. This thesis aimed to develop a cost of downtime model, with particular emphasis on the application of the model to Australia Post’s Flat Mail Optical Character Reader (FMOCR). The costing analysis determined a cost of downtime of $5,700,000 per annum, or an average cost of $138 per operational hour.

The second section of this work focused on the use of the cost of downtime to objectively determine areas of opportunity for cost reduction on the FMOCR. This was the first time within Post that maintenance costs were considered along side of downtime for determining machine performance. Because of this, the results of the analysis revealed areas which have historically not been targeted for cost reduction. Further exploratory work was undertaken on the Flats Lift Module (FLM) and Auto Induction Station (AIS) Deceleration Belts through the comparison of the results against two additional FMOCR analysis programs.

This research has demonstrated the development of a methodical and quantifiable cost of downtime for the FMOCR. This has been the first time that Post has endeavoured to examine the cost of downtime. It is also one of the very few methodologies for valuing downtime costs that has been proposed in literature. The work undertaken has also demonstrated how the cost of downtime can be incorporated into machine performance analysis with specific application to identifying high costs modules. The outcome of this report has both been the methodology for costing downtime, as well as a list of areas for cost reduction. In doing so, this thesis has outlined the two key deliverables presented at the outset of the research.

Identiferoai:union.ndltd.org:ADTP/265893
Date January 2007
CreatorsFox, James P.
PublisherQueensland University of Technology
Source SetsAustraliasian Digital Theses Program
Detected LanguageEnglish

Page generated in 0.0019 seconds