The target of this master thesis is specify the requirements, which come up while summing the investment aim of a new 40MW energetic unit, and show the overall project management. Thesis is divided into two parts. First part deals with project management from the investors point of view. There is also detailed concept study, technological description of piston co-generation units and combined cycle, concept design of calculated variations and their economical analysis. Second part is taken from the point of view of the main supplier. There is defined the range of operations, documents and official permissions needed for successful finish of the civil part of the energetic unit project.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:230034 |
Date | January 2012 |
Creators | Šaroun, Josef |
Contributors | Pospíšil, Jiří, Fiedler, Jan |
Publisher | Vysoké učení technické v Brně. Fakulta strojního inženýrství |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0018 seconds