The dependency of continuous electricity supply is high in the Swedish society today, at the same time no one is willing to pay for a too costly or over dimensioned power distribution system. The owners of the distribution systems are the ones responsible for this balance act of maintaining a high quality of electricity delivery to customers at a reasonable cost. In this master thesis a limited part of the primary distribution system (10 kV), owned by Mälarenergi Elnät AB and located in the city centre of Västerås, was chosen for a deeper analysis of its reliability. Its ability to handle outages of system components (N-1 and N-2 contingency analysis) was investigated to find out potential weak spots and parts of the grid that showed signs of being overdimensioned. The results of the performed simulations showed that in 74 % of the studied N-1 contingencies cases, consisting of outages of a bus bar in a distribution substation, the system could handle this without causing outages in other parts of the grid. For the N-2 contingencies 61 % passed the test. It was also found that one of the two included high voltage substations could alone supply the investigated part of the grid. Some cables and transformers were found to be more or less unnecessary, whereas other components proved to be overloaded in several situations.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:uu-255640 |
Date | January 2015 |
Creators | Arvidsson, Mari |
Publisher | Uppsala universitet, Elektricitetslära |
Source Sets | DiVA Archive at Upsalla University |
Language | Swedish |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Relation | UPTEC ES, 1650-8300 ; 15023 |
Page generated in 0.0025 seconds