Return to search

Aplicação do metodo DMAIC no gerenciamento de inventario / DMAIC method application in nventory management

Orientador: Ademir Jose Petenate / Dissertação (mestrado profissional) - Universidade Estadual de Campinas, Faculdade de Engenharia Mecanica / Made available in DSpace on 2018-08-05T21:53:14Z (GMT). No. of bitstreams: 1
Krahembuhl_CarlosEduardoZoppi_M.pdf: 9607428 bytes, checksum: dd179dbe75dda87476281150130dda7d (MD5)
Previous issue date: 2005 / Resumo: As organizações necessitam constantemente se aprimorar e reduzir custos devido a percepção do cliente quanto ao valor que ele realmente está disposto a pagar por um produto. Dentre os diversos métodos de melhoria contínua, o DMAIC (sigla em inglês de Define, Measure, Analyse, Improve e Control) vem ganhando adeptos devido aos casos de sucesso apresentados por empresas como General Eletric e ABB. Este trabalho tem por objetivo avaliar as dificuldades e facilidades na aplicação do DMAIC sendo proposto um método de avaliação para implantação de cada uma de suas fases. O estudo de caso apresenta o bom resultado na redução de inventário em uma empresa de autopeças que desconhecia o método. O nível de inventário é um bom indicador de eficiência das empresas por estar relacionado com o desempenho da produção (programação, fluxo de processo, rejeição), manutenção de máquinas e qualidade de fornecedores. Os resultados financeiros obtidos foram considerados satisfatórios pela empresa apesar do tempo gasto na conclusão do trabalho. A estruturação lógica das fases do DMAIC compensa a dificuldade da aplicação de algumas de suas ferramentas, mas os fatores liderança e motivação da equipe, além da participação do patrocinador foram considerados essenciais para o sucesso de um proj eto de melhoria / Abstract: Now a days companies need to improve your process and reduce costs because the customers know how much they want to pay for a product. Among some improvement methods, DMAIC (Define, Measure, Analyse, Improve and Control) has wide recognition because good results shown by General Eletric and Motorola. The objective of this work is to evaluate the difficulty and facility for each phase of DMAIC. This case study shows the inventory reduction in a automaker parts that didn't know DMAIC method. The inventory leveI is a good metric because it's related with production performance (schedule, process flow, scrap), machine
maintenance and quality suppliers. The financial results were good to the company although project time expended. The logic phases structure of DMAIC is balance the difficulty to apply some tools, but, team leadership, team motivation and champion participation are to critical to improvement project success / Mestrado / Gestão da Qualidade Total / Mestre em Engenharia Mecânica

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.unicamp.br:REPOSIP/264776
Date09 August 2005
CreatorsKrahembuhl, Carlos Eduardo Zoppi
ContributorsUNIVERSIDADE ESTADUAL DE CAMPINAS, Petenate, Ademir José, 1950-, Button, Sergio Tonini, Bacic, Miguel Juan
Publisher[s.n.], Universidade Estadual de Campinas. Faculdade de Engenharia Mecânica, Programa de Pós-Graduação em Engenharia Mecânica
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguagePortuguese
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/doctoralThesis
Format151 p. : il., application/pdf
Sourcereponame:Repositório Institucional da Unicamp, instname:Universidade Estadual de Campinas, instacron:UNICAMP
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0027 seconds