Submitted by SAULO GOMES MOREIRA null (saulo.moreira@ufms.br) on 2017-07-10T19:51:39Z
No. of bitstreams: 1
Tese - Saulo Gomes Moreira - versão final.pdf: 2776138 bytes, checksum: 0b13189e5f5b94bb917bb0912bd62b0f (MD5) / Approved for entry into archive by Monique Sasaki (sayumi_sasaki@hotmail.com) on 2017-07-13T20:43:59Z (GMT) No. of bitstreams: 1
moreira_sg_dr_ilha.pdf: 2776138 bytes, checksum: 0b13189e5f5b94bb917bb0912bd62b0f (MD5) / Made available in DSpace on 2017-07-13T20:43:59Z (GMT). No. of bitstreams: 1
moreira_sg_dr_ilha.pdf: 2776138 bytes, checksum: 0b13189e5f5b94bb917bb0912bd62b0f (MD5)
Previous issue date: 2017-06-02 / No planejamento da integração de fontes de geração distribuída no sistema de distribuição em baixa tensão é fundamental que haja a investigação dos efeitos provocados nas condições operacionais da rede, tais como níveis de tensão e carregamento de transformadores. Com vista ao potencial aumento da geração fotovoltaica no cenário brasileiro e à iminente migração tecnológica das redes tradicionais para as chamadas redes inteligentes, a resposta da demanda se apresenta como uma das estratégias para possibilitar uma integração eficiente de recursos energéticos distribuídos. Na aplicação de um programa de resposta da demanda, especificamente para o cenário de uma distribuidora, permitiu-se concluir, através da utilização de dados reais, que no processo de planejamento de integração de novas fontes de geração de natureza fotovoltaica, a aplicação de uma estrutura tarifária com custos diferenciados horários baseados no custo marginal de capacidade do sistema, possibilita que sejam observadas melhores condições operacionais da rede. A aplicação da nova estrutura tarifária horária indica uma significativa alteração no perfil de carga esperado dos consumidores de baixa tensão o que refletiu em melhores valores de níveis de tensão e aumento da capacidade livre do transformador em integrar novas fontes distribuídas no sistema. / In planning the integration of distributed generation sources in the low voltage distribution system, it is essential to investigate the effects caused by the network operating conditions, such as voltage levels and transformer loading. By the point of view of the potential increase in photovoltaic generation for the Brazilian scenario and the imminent technological migration of traditional networks to the so-called Smart Grids, demand response is one of the strategies to enable the efficient integration of distributed energy resources. By applying a demand response program, specifically for the scenario of a distribution company, it was possible to conclude, by using real data, that in the integration planning process of new photovoltaic based generation sources, the application of a tariff structure with hourly differentiated costs based on the system's marginal cost of capacity, allows better operational conditions of the network to be observed. The application of the new hourly tariff structure indicates a significant change in the expected load profile of the low voltage consumers, which reflected in better values of voltage levels and rising of the free capacity of the transformer to integrate new distributed sources into the system.
Identifer | oai:union.ndltd.org:IBICT/oai:repositorio.unesp.br:11449/151083 |
Date | 02 June 2017 |
Creators | Moreira, Saulo Gomes [UNESP] |
Contributors | Universidade Estadual Paulista (UNESP), Paschoareli Júnior, Dionízio [UNESP] |
Publisher | Universidade Estadual Paulista (UNESP) |
Source Sets | IBICT Brazilian ETDs |
Language | Portuguese |
Detected Language | Portuguese |
Type | info:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/doctoralThesis |
Source | reponame:Repositório Institucional da UNESP, instname:Universidade Estadual Paulista, instacron:UNESP |
Rights | info:eu-repo/semantics/openAccess |
Relation | 600 |
Page generated in 0.1435 seconds