The Electricidade de Moçambique, E.P. (EDM) is the power utility in Mozambique, responsible to generate, transport and distribute electricity all over the country. The company has three gas turbines installed at Maputo Power Plant. All units burn diesel oil and are used only for back up. Currently only the unit #2 is available for operation. The main constraint that EDM faces is the high operation costs due to diesel price. Hence the company is considering converting units #2 and #3 to burn natural gas, resource available locally. The country is currently exporting natural gas to the neighbouring Republic of South Africa. This MSc thesis project calculates the power output of all gas turbines when burning natural gas and optimizes the power plant capacity by proposing modifications of the current power turbine cycles to allow sustainable operation
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:kth-124249 |
Date | January 2013 |
Creators | Abacar, Armando |
Publisher | KTH, Kraft- och värmeteknologi |
Source Sets | DiVA Archive at Upsalla University |
Language | English |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.002 seconds