The goal of this thesis is to design measures of the distribution network in Brno to ensure a supply of electricity to its consumers in required quantity, quality and reliability. This project will be solved in the program called PAS DAISY Off-Line v.4.00 Bizon. At first we make an analysis of the steady state of the distribution network. We check load of transformer stations 110/22 kV, overhead and cable lines if they operate in allowed limits. Then we complete or correct reserved power drains of big consumers of electricity in the model of distribution system. From the calculation of the steady state of the distribution network we will probably find out that some parts of the system are overloaded. Therefore we suggest changes for it (like switching over circuits, installation of new transformer stations and circuits), which should ensure safety and reliability of operations in the distribution system.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:217200 |
Date | January 2008 |
Creators | Lakomý, Vojtěch |
Contributors | Nepevná, Vlastimila, Blažek, Vladimír |
Publisher | Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.002 seconds