Many reasons to consider extending the useful time of ageing wind farms. Like to take advantage of it being located in a good wind source, besides existing infrastructure, etc. Repowering can be an appropriate option for the ageing wind farm that suffering less yield energy and increment of cost of operation and maintenance. The thesis discusses the repowering potential of old wind farms. The case study is implemented on a selected wind farm in Denmark. Different repowering scenarios were considered with the technical-economic assessment for each scenario to determine which scenario is viable. The sensitivity analysis was done taking into consideration selected parameters to find out the effect of each parameter on the profitability and productivity of the repowered wind farm. More details will be explored in the following chapters.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:uu-435161 |
Date | January 2021 |
Creators | Al Hamed, Hassan |
Publisher | Uppsala universitet, Institutionen för geovetenskaper |
Source Sets | DiVA Archive at Upsalla University |
Language | English |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0013 seconds