There are definitely many reasons for choosing off-grid wind power systems. Few key ones involve the positive enhancement of societies, economies and natural environments. From a project developers’ perspective these systems provide a large potential market, which can cover a wide range of applications with relatively reasonable costs. In spite of this, many challenges may interfere with the diffusion and the success of such systems. In the report we discuss the various factors affecting the implementation of off-grid wind power systems and demonstrate some of the challenges project developers may be facing during the planning stage. Some of these include the acceptance of stakeholders (local inhabitants in particular) and the securing of the financing of the projects. Another noted challenge lying outside the control of project developers was found to be the absence of encouraging policies and incentives. As a conclusion the thesis provides a set of self-interpreted recommendations along with a flow chart. The concluded summary indicates some key factors that project developers should be aware of and careful when dealing with, these which include: The choice of the site, verification of projects’ economics along with the securing of a convenient finance. The recommendations also point out the great advantage in having local developers as these tend to be more capable in building relations with the local citizens and politicians.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:uu-396057 |
Date | January 2019 |
Creators | El Zein, Musadag |
Publisher | Uppsala universitet, Institutionen för geovetenskaper |
Source Sets | DiVA Archive at Upsalla University |
Language | English |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0017 seconds