Return to search

Otimização da produção de poços de petróleo com injeção contínua de gás e alinhamento poço-separador

Dissertação (mestrado) - Universidade Federal de Santa Catarina, Centro Tecnológico, Programa de Pós-Graduação em Engenharia de Automação e Sistemas / Made available in DSpace on 2012-10-26T01:38:33Z (GMT). No. of bitstreams: 1
301173.pdf: 561944 bytes, checksum: 89164bd27810ec50dbd55e245691374b (MD5) / The lift-gas allocation problem with well-separator routing constraints is a mixed-integer nonlinear program of considerable complexity. To this end, a mixed-integer linear formulation (compact) is obtained by piecewise-linearizing the nonlinear curves, using binary variables to express the linearization and routing decisions. A new formulation (integrated) combining the decisions on linearization and routing is developed by using a single type of binary variable. The structures of both formulations are explored to generate lifted cover cuts. Numerical tests show that the use of cutting planes in a cut-and-branch scheme accelerates the resolution time. The solution of the integrated formulation using cutting-plane generation is faster in spite of having more variables than the compact formulation

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.ufsc.br:123456789/95437
Date26 October 2012
CreatorsCodas, Andrés
ContributorsUniversidade Federal de Santa Catarina, Camponogara, Eduardo
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Format87 p.| il., tabs., grafs.
Sourcereponame:Repositório Institucional da UFSC, instname:Universidade Federal de Santa Catarina, instacron:UFSC
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.002 seconds