<p>Construction companies are frequently criticized for high prices and long construction time. At the same time, statistics shows that construction workers are on the sick-list for occupational injuries or casualties more than other groups at the labour market.</p><p>Skanska built a block of flats with tenant-ownerships in Gävle. The construction consists of concrete walls with in-fill walls in the front. The purpose with this degree project is to perform a risk analysis in work environment with focus on repetitive strain injuries and control the time report for in-fill walls manufactured in a field factory. The result of this project will help to make more realistic cost predictions in the future.</p><p>This degree project has been performed in cooperation with the construction company Skanska. It based on literature studies, interviews and field studies.</p><p>The result shows that the work environment is satisfactory with few exceptions and the time report is a lot higher than calculated</p>
Identifer | oai:union.ndltd.org:UPSALLA/oai:DiVA.org:hig-4093 |
Date | January 2009 |
Creators | Larsson, Mattias |
Publisher | University of Gävle, University of Gävle, Department of Technology and Built Environment |
Source Sets | DiVA Archive at Upsalla University |
Language | Swedish |
Detected Language | English |
Type | Student thesis, text |
Page generated in 0.0023 seconds