Return to search

New Transmission Planning Methodology For Requesting Proposals For Wind Generation

One technique used to control the influx of renewable generation while maintaining competitive principles is a Request for Proposals (RFP). However, lack of transmission planning due to a disconnection between generation and transmission owners, difficulty in identifying viable projects, and high risk for proponents stand as obstacles to the goals of an RFP. This research proposes a procedure which minimizes the effect of these obstacles; meeting the purchaser requirements for low price and combining conventional planning concepts with feedback from competitive structures. The general features of the method include definition of generation limits and study area, expansion plan design, transmission cost evaluation, optimal selection of requested generation levels, and final selection of successful proponents. A case study using a real system in New Mexico demonstrates these concepts.

Identiferoai:union.ndltd.org:LACETR/oai:collectionscanada.gc.ca:MWU.1993/4168
Date10 September 2010
CreatorsIsaacs, Andrew
ContributorsRajapakse, Athula (Electrical and Computer Engineering), Jacobson, David (Electrical and Computer Engineering) Bibeau, Eric (Mechanical and Manufacturing Engineering)
Source SetsLibrary and Archives Canada ETDs Repository / Centre d'archives des thèses électroniques de Bibliothèque et Archives Canada
Languageen_US
Detected LanguageEnglish

Page generated in 0.002 seconds