This thesis first develops a medium-voltage grid code outlining stringent requirements for low-voltage ride-through, high-voltage ride-through and ancillary services based on anticipated grid requirements for distributed energy resources (DER)s. A 100 kW generating capacity DER study system is then formulated taking into consideration key design constraints as motivated by the medium-voltage grid code. Local DER system controls are developed that enable existing systems employing conventional current-control for the grid-interfacing voltage-sourced-converters to comply with the grid code. A supervisory controller is proposed that allows multiple DER units and loads to operate collectively as a DER system with a single point of common coupling. The impact of transformer configurations, fault types and fault locations on DER systems are quantified through a comprehensive fault study using the PSCAD/EMTDC software package. A subset of these fault scenarios are identified for rapid screening of DER system compliance against low-voltage ride-through requirements.
Identifer | oai:union.ndltd.org:LACETR/oai:collectionscanada.gc.ca:OTU.1807/31279 |
Date | 12 December 2011 |
Creators | Kish, Gregory |
Contributors | Lehn, Peter W. |
Source Sets | Library and Archives Canada ETDs Repository / Centre d'archives des thèses électroniques de Bibliothèque et Archives Canada |
Language | en_ca |
Detected Language | English |
Type | Thesis |
Page generated in 0.0017 seconds