The subject of this thesis is the preparation of project documentation kindergarten. The building is situated on flat terrain in Kromeriz. This is a kindergarten consisting of two objects. SO01 building has two floors, with two departments for children and the economic part, SO02 single-storey building with one department for children. The building will be based on the footings of plain concrete C 20/25. Priming concrete slab will also unreinforced concrete C20 / 25, equipped with curry networks with a diameter of 6 mm and a mesh size of 150x150 mm. Perimeter, internal bearing partition walls and floors are designed from the system POROTHERM, the upper part of the foundations is made of shuttering blocks BEST 500x300x250 mm. The insulation system is designed BAUMIT ETICS. The horizontal structure of the ceiling is solved keramobetonovým ceiling Porotherm (POT beams and inserts MIAKO) thick. 250 mm. The staircase is designed reinforced concrete. The chimney will be built from the system SCHIEDEL ABSOLUT a ventilation shaft. The roof consists of extensive vegetation flat roof.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:265575 |
Date | January 2017 |
Creators | Šišková, Šárka |
Contributors | Klímek, Karel, Čuprová, Danuše |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0015 seconds