This diploma thesis deals with reliability assessment of the Nové Mlýny dam during flood routing of extreme flood with emergency spillway. Capacity of current emergency spillways was assessed and flood routing for theoretical flood waves was examined. Results showed insufficient capacity of the spillway for routing of 10 000 year flood. Therefore variants of corrective measures leading to reliability increase were proposed.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:226129 |
Date | January 2013 |
Creators | Slavětínský, Radek |
Contributors | Rainer, Vít, Jandora, Jan |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0015 seconds